How would you do a Slab on Grade with a post and beam garage in New Hampshire?
...slab on grade raft slab which only requires digging 6 inches down to remove the organic layer as it is all built on a flat surface with no thickened edge footing needed. Raft slabs distribute the load of the building evenly over the whole surface. The page linked above is an example of just such a slab.