Energy efficient design / Discussions

Do prefabricated houses that are more energy efficient take longer to build?

...energy efficient than a similar counter part that is less efficient would take longer to build? The difference in the time it would take to build an energy efficient Prefab Home compared to a code-built less efficient home would be negligable. Any company you want to work with should be able to give you a sense of time...

Posted by Ross Breton Oct. 27, 2024 Prefab homes 2 responses

How do you do a vapor barrier in a dense pack cellulose wall?

On the page of your site about dense packed cellulose walls  you show an exterior wall with 10" plate & sill and two rows of 2x4 studs. This looks fantastic, but the idea of vapour-permeable membranes on both sides makes me nervous in combination with cellulose. In Ottawa, temp can drop to -25 in winter and reach +...

Posted by Ian MacKay July 26, 2018 Wall assemblies - renovation 4 responses