What are the best below grade drainage layers for a slab on grade foundation?
...grade board and i've seen the EPS 2" go under the grade board and over the sonopost piers (8' apart). the floating slab gets poured either against 24" vertical EPS or against 10 mil poly coming up the interior grade board. if the EPS goes under interior and exterior grade board then how far past the house wall should i...