...demolitionwaste, or enough to fill 639,642 garbage trucks.
Installing 100,239 sq metres of green roofs, or an area the size of 66 NHL hockey rinks. Green roo...
...Demolitionwaste management: Prior to demolition of the old home, the following items were salvaged: windows and doors, hardwood floor, trim, kitchen cabinets, ...
...demolition and construction. Over 80% of demolition building waste, such as masonry, lumber, metalwork, and gypsum plaster, was recycled.
The site also needed...
...waste that will be sent to a landfill. From a material conservation and sustainability point of view, that would always be our recommended course of action if t...
...waste.
Much of the materials available online come from decommissioned commercial buildings rather than houses, as the quantities available are worth the effo...