...buildingplans for Eco friendly houses. We don’t currently have plans we can offer unfortunately. There are Passive House and LEED certified prefab kit homes av...
Posted by Derek KittilsenAug. 4, 2019, 12:09 p.m.Planning and Design5 Responses
...plans to build an eco-friendly house in New Brunswick. We don't have green home plans to offer sorry, but you should check out our prefab LEED and Passive House...
Posted by Moyra FrancisOct. 25, 2019, 5:55 p.m.Concept and design2 Responses
...Building Code anymore. Many regional building codes can get a little complicated and Ontario is no exception, but you would likely also need R7 continuous insul...
...building our first home. We purchased some basic house plans that are designed for a slab on grade home. I am really leaning towards slab on grade for the aesth...
Posted by Matthew GioiaJuly 7, 2020, 11:03 p.m.Heating and cooling3 Responses
...building authorities to find out any minimum or maximum house sizes per lot to make sure you are allowed to build this house there, and you’d need to make sure ...
...buildingplans, septic plans, permits and such, so you need to be really focused when initially designing to keep costs at a bare minimum. These pages would be ...
Posted by Paul SquireNov. 8, 2018, 8:25 p.m.Concept and design1 Responses
Is there a list of engineers we can consult with regarding having our plans modified to a slab on grade (monolithic) foundation as most municipalities would re...
Posted by Paul GiustoDec. 30, 2019, 8:12 a.m.Slab on Grade1 Responses
...buildingplans and structural details they will in turn provide you with stamped engineering drawings for your slab as well as step by step installation directi...
Posted by Greg HooksNov. 20, 2019, 3:35 p.m.Slab on Grade1 Responses
...buildingplans and create walls to match that can be delivered and assembled, that can be a great option as it is often cheaper as there is less material waste....
Building a 24 X 50 Post and Beam barn. Thinking of applying 2 layers of 4 " (8" total) of rigid insulaton, offset seams on top of 1 X 8 sheathing. Seams of top...
We are thinking of building a pole barn home in an area where there is likely to be bedrock if we tried to dig much. Over the 24 foot width of the home, the gr...
...building tape you will find in the box stores, they aren’t nearly as sticky and don’t have the same lifespan.]
You will have to make sure that you ‘transfer’ ...
...plans for a passive, off the grid home? I am interested in the style of the Edelweiss House. We could follow the plans to build as the general contractor. Thank...
...building directly on solid rock and have no drainage issues or had no clay, building with a footing could be a bit cheaper, but not better. In your case Steve, ...
Posted by Steve SykesAug. 18, 2019, 3:21 p.m.Slab on Grade1 Responses
...building? 24 months Great Steven, that's plenty of lead time. Best is if you go to the individual model that most interests you and request a quote, if there ar...
...building? There has been a lot of demand and our manufacturers are booked up until at least next summer. The best way to know when they will be available would ...